Basic building costs £/m2.

£2000m2

Services cost £/m2.

£827m2

External works cost £/m2.

£47m2

Gross floor area.

700m2

Total area of the site.

33000m2

Function area and their size.

  • Key stage 1 721m2
  • Key stage 2 185m2

Area of circulation.

138m2

Area of storage.

44m2

% of grounds and /or building used by the community

  • 41m2 of the existing building has been re-modelled for community use.
  • The football pitches have the option to provide 2450m2 of community use.

Predicted electrical consumption kWh/m2.

22.94 kWh/ year/ m2

Predicted fossil fuel consumption kWh/m2.

Predicted water use m/3 person/ year.

15 litres of hot water per day per pupil

% of water provided by rainwater or greywater.

There is no rainwater harvesting

Steps taken during construction to reduce environmental impacts

  • Willmott Dixon operates an IS0 14001: 2004 compatible Environmental Management System.
  • Willmott Dixon have a Site Waste Management plan in place to reduce the amount of waste that is sent to land fill.
  • Willmot Dixon have had a code of conduct in place and safeguarding children policy.
  • The considerate contractor’s scheme has been implemented.
  • The timber used on the job has been sustainably sourced.
  • Willmott Dixon have implemented best practice policies in respect of air (dust) and water(ground and surface) pollution arising from the site

List of social or economically sustainable measures achieved.

  • The school football pitches have been reseeded and upgraded.
  • The adult learning centre has been refurbished.